The Likhu IV Hydropower Project is located in the central/eastern development regions of Nepal. It is designed as a run of the river scheme having an optimised capacity of 51MW comprising 3 x 17MW generating units and vertical shaft Francis turbines. The turbines will operate at a rated head of 228 metres and a total flow of 26 cumecs. The power station is being build above ground and power will be connected to the Khimti I substation by a 25 kilometre long 132kV transmission line. A 30 metre high dam will be built across the Likhu River to create a daily pondage for peak production. The water will be carried in a 4 km long 4 metre diameter headrace tunnel to the power station. The estimated cost of the project is around US$ 75 million.
District Roads Support Programme - Nepal
The project was designed to create and/or enhance the capacity in the Districts to manage the road transport infrastructure, involving organisations from Government and private sector on local, district and national level. DRSP...
Small-Hydropower in Salleri Chialsa in Nepal
Design & construction of all structures related to a 2 x 200 KW run-of-river small hydropower scheme. Implementation of a scheme in an area without road access (nearest road 2 days walk away). Development of a sustainable locally based institution, managing all aspects of the electricity utility. »»»

Charnawati Rehabilitation Project - Nepal
The Charnawati River in the central part of Nepal often floods during the monsoon season. It runs alongside an important highway and, with bed levels of up to 17 percent and steep side slopes, causes significant damage to the environment. After one such flood event, Iteco was called in to assess the situation and propose remedial measures. »»»